Thruster Change for Stena Don
In may 2009 Abyss carried out a thruster change of the drilling rig Stena Dons during its stay at
Vestbase in Kristiansund. The thruster change operation was completed in one day. Abyss also
carried out an In-water survey/bottom survey of the rig, and changed the complete set of
anodes for all thrusters. These operations were carried out during five days.
Add this page to your favorite Social Bookmarking websites
Vestbase in Kristiansund. The thruster change operation was completed in one day. Abyss also
carried out an In-water survey/bottom survey of the rig, and changed the complete set of
anodes for all thrusters. These operations were carried out during five days.
Stena Don is a dynamically positioned (class 3), harsh environment semi-submersible drilling,
completion and workover vessel for worldwide operations.
It has 6 x Kameva Aqua Master Azimuth Thrusters.
Add this page to your favorite Social Bookmarking websites